HORIZON SHIELD Construction Cost Data
Public construction cost data from official documents, served row by row with the source URL and licence on every row. JCCDB covers Japan: 95,403 line items plus dated observations such as MLIT design labor rates, regional material prices, public-works unit prices and cost indexes. USCCDB, the United States Construction Cost Database, covers Davis-Bacon prevailing wages, BLS wages, building permits, cost indexes, area factors and state DOT bid prices. For the United States it also estimates prices along the distribution chain for construction materials and chemicals, from landed import cost to wholesale, retail and contractor, computed on request with the formula and sources on every row; computed values are marked computed:true. Public-works prices, statistics and estimates are reference data, not renovation quotes. For a verdict on a Japanese renovation quote, use the HORIZON SHIELD server (https://mcp.horizonshield.dev/mcp). All 15 tools are read only. No credentials needed.
Choose a connection option
15 tool names reported
Source-declared tools. Availability can depend on the connection and permissions; these are not runtime test results.
Claude connector directory ↗ · Observed 2026-11-01 · Completeness not established
compare_jccdb_regionsget_jccdb_coverageget_jccdb_index_seriesget_jccdb_labor_rateget_jccdb_observationsget_jccdb_work_unit_priceget_us_area_factorget_us_construction_pricesget_us_contract_discountsget_us_import_landed_costget_us_permitsget_us_prevailing_wageget_us_price_chainget_us_trade_marginssearch_jccdb_items
Sources and provenance
- Claude connector directoryClaude tier: community · Observed
- Official MCP RegistryObserved
Grouping basis: endpoint. Exact endpoints or package sets can be grouped automatically; other relationships require evidence review. This does not verify publisher affiliation, connection health, or equivalent capabilities.