Ganttly Project Timeline

Official status unknown2 tools reported2 sources

Ganttly Project Timeline builds a project schedule and Gantt chart from a task list using the critical path method (CPM). It is used by project managers, team leads, consultants, and students planning a thesis. List tasks with durations, dependencies, and a start date. Ganttly returns early start, early finish, late start, late finish, and total float for each task, the critical path, milestones, and the project end date. Calendars: plan on business days that skip weekends and the public holidays of a chosen country (with regional holidays, local weekends such as Friday-Saturday, and your own days off such as a year-end shutdown), or on plain calendar days. Durations can be given in days or weeks. Dependencies are finish-to-start and can carry a lag ("Design+2") or a lead ("Build-3"). Tasks can have a start-no-earlier-than date, an owner, or be zero-length milestones. The interactive chart has a day and week axis, task bars, dependency arrows, the critical path in red, float after each bar, milestone diamonds, and a today line. Tap a task for its dates and float, and test a slip to see the new end date and critical path. What-if analysis compares up to four scenarios against the plan, for example how far a 5-day slip moves the finish and which tasks become critical. Downloads: a CSV schedule, an.ics calendar file with milestones and task start dates, and an SVG image of the chart for slides and documents. The schedule is computed by deterministic code, so the same inputs give the same dates. Dependency loops and unknown task names are explained in plain language. Example: "Make a Gantt chart starting 2026-11-02: Design 5 days; Build 10 days after Design; Test 4 days after Build; Docs 3 days after Design; Launch milestone after Test and Docs." Limitations: finish-to-start links only (no start-to-start or finish-to-finish), whole-day scheduling, and no resource levelling, costs, or progress tracking. Plans are not saved or synced with project tools.

Choose a connection option

  • Remote endpoint

    Official status unknown

    Transport not established · Authentication not established

    https://gantt-timeline.zovo.one/mcp

    Use the source documentation for installation instructions. No command has been inferred.

    Connection source and version

    Reported by Claude logoClaude connector directory

  • Remote endpoint

    Official status unknown

    streamable-http · Authentication not established

    https://gantt-timeline.zovo.one/mcp
    Connection source and version

    Source-declared version: 1.0.0

    Reported by Official MCP Registry

2 tool names reported

Source-declared tools. Availability can depend on the connection and permissions; these are not runtime test results.

Claude connector directory ↗ · Observed 2026-11-01 · Completeness not established

  • compare_timeline_scenarios
  • plan_project_timeline

Sources and provenance

Grouping basis: endpoint. Exact endpoints or package sets can be grouped automatically; other relationships require evidence review. This does not verify publisher affiliation, connection health, or equivalent capabilities.