Costable — Parametric Should-Cost Analysis
Parametric should-cost: P50/P80/P90 estimates, 801 materials, 25 countries, quote review.
Connection details
Sources and provenance
- Official MCP RegistryObserved
Grouping basis: endpoint. Exact endpoints or package sets can be grouped automatically; other relationships require evidence review. This does not verify publisher affiliation, connection health, or equivalent capabilities.